Double wall pipe systems designed to class requirements

Regardless of which classification society approves the vessel, the requirements for gas fuel piping are largely identical, because they derive from the IMO international gas codes, IGC and IGF. LR Marine designs, fabricates and documents double wall pipe systems that meet those requirements for LNG, methanol, ammonia and other fuels with a low flash point.

Many requirements are agreed on a project-to-project basis with the classification society. Involving the pipe supplier early is usually the least expensive way to avoid changes later in the project.

When double wall pipe is required

According to IMO regulations, gas fuel piping should not pass through accommodation spaces, service spaces or control stations. Where it passes through or extends into other spaces, one of two conditions must be fulfilled.

The first option is a double wall piping system with the gas fuel contained in the inner pipe, where the space between the concentric pipes is pressurised with inert gas at a pressure greater than the gas fuel pressure, with suitable alarms to indicate a loss of inert gas pressure. The second option is piping installed within a ventilated pipe or duct, where the air space between the gas fuel piping and the inner wall of the duct is equipped with mechanical exhaust ventilation having a capacity of at least 30 air changes per hour.

LR Marine fabricates the pipe system according to the preference of the client. The system can be delivered with branches allowing pressurization with inert gas and fitted with connections for pressure sensors. The integration of the alarm systems themselves falls outside our scope.

A note on ventilation and cryogenic service

If ventilation is selected rather than inert gas pressurization, one consequence deserves attention at the design stage. When the service pipe operates at cryogenic temperature, any moisture introduced through the ventilation air will condense and turn into ice inside the annulus. This is worth weighing against the simplicity of a ventilated arrangement before the choice is fixed.

Materials and qualification of the service pipe

The service pipe is typically AISI 316L stainless steel. Stainless steel is not directly prescribed by the codes, but as the most commonly available material with the necessary ductility at cryogenic temperatures, it is the usual choice. Other materials, including super duplex, can be fabricated.

Both the service pipe and the conduit material requirements are clearly defined by the codes, as are the test requirements, which include impact testing and tensile strength testing. Testing may not be carried out at the manufacturer’s location, and some tests must be performed at temperatures below ambient, which not all test facilities are equipped for. The time needed to qualify the material should therefore be built into the project schedule from the start.

Wall thickness and pressure rating

Wall thickness is calculated through the code requirements and depends on the material type and on whether the pipe is welded or seamless. This matters commercially as well as technically: seamless stainless steel pipes are both expensive and difficult to source, so the choice should be agreed with the classification society at an early stage.

The conduit carrying the service pipe must have the same pressure rating as the service pipe. Even where the operating pressure in the annulus is low, the classification society will normally require matching pressure ratings. Standard catalogue components are based on a PN10 rating for both inner and outer pipe; for projects with 2-stroke engines, where pressures can be considerably higher, wall thickness is calculated on a project specific basis.

Joints, penetrations and terminations

Only butt welding is permitted for joining the service pipe. Flanges may be used where butt welding is not practically possible, or where units must be removable for maintenance.

Bulkhead penetrations are available as welded penetrations or as Roxtec penetrations, for insulated single wall pipe, insulated double wall pipe and VIP or un-insulated double wall pipe. Roxtec penetrations reduce the amount of welding of pipes to decks and bulkheads and provide sealing and fire stopping for the plastic casing.

Pipe terminations for low temperature applications use a cryogenic end-cap that eliminates water ingress and controls the temperature in the heat shrink area. The seal between the pipe casing and the stainless steel end-cap is made with a crosslinked heat shrinkable end seal that is both watertight and diffusion tight, and can be used in direct sunlight at ambient temperatures between −40°C and +80°C.

Stress analysis

For pipes with design temperatures below −110°C, the pipe system must be analyzed using a computerized stress analysis method. In practice this covers most gas fuel systems, since there is a risk of liquid gas flowing through the pipe.

LR Marine uses Caesar II. The pipe system is described in 3D, external loads are applied, and the analysis breaks the system into small elements to determine stresses, strains and movements at every node. Using the operating conditions agreed with the classification society, the analysis identifies areas with stress concentrations beyond the limits. The analysis can take both temperature loads and accelerations into account. LR Marine submits both the Caesar II report and a summary of the results.

Welding, NDT and documentation

Welders must be qualified per EN 287 or a similar project specific qualification procedure, holding a valid certificate covering all sizes and wall thicknesses used on the project. Welding procedures are prepared and approved by the classification society before the pipe system is installed, and backing gas is used during welding to avoid damaging the passive stainless steel surface.

NDT levels are determined by the classification society for the specific project, but typically service pipe welds require 100% NDT and the secondary pipe a minimum of 10% of welds examined. All welds on spools supplied by LR Marine are x-rayed before delivery, and the service pipe is pressure tested where required. The secondary pipe cannot be pressure tested during fabrication, so this is carried out as part of the system test.