When a vessel is built for or converted to LNG propulsion, the fuel piping is one of the systems that determines both safety and installation time. LR Marine supplies complete bunker pipe systems — single wall and double wall, insulated and un-insulated — for LNG and other fuels with a low flash point. Every system is designed to meet the requirements of the IMO gas codes, IGC and IGF, and the rules of the relevant classification society.
The systems are based on pre-insulated pipe technology with roots in Løgstør, Denmark, or alternatively the vacuum insulation system developed by LR Marine. LR Marine has supplied pipe insulation for LNG carriers since 2001, and the pre-insulated pipe system has been delivered for cryogenic pipe insulation on more than 30 LNG carriers. Using the same technology for LNG propulsion was a natural step.
The IMO restrictions on emissions from ships, in force in the Emission Control Areas since 2015 and worldwide since 2020, significantly limit sulphur emissions. LNG has virtually no sulphur content and produces low NOx compared with fuel oil and marine diesel oil, which made it the first widely adopted alternative.
Methanol and ammonia are now emerging as leading candidates for low- and zero-carbon marine fuels. Methanol is liquid at ambient conditions, relatively easy to store and handle onboard, can be produced from renewable sources, and burns cleanly with lower NOx and no sulphur emissions. Ammonia is fully carbon-free and eliminates CO₂ emissions during use, but its toxicity and combustion characteristics require advanced engine designs and safety systems. What these fuels have in common is that they introduce specific safety and handling requirements for the fuel piping system.
A complete LNG fuel system can be broken into five piping sections: the insulated cryogenic bunker pipe from the vessel’s bunker station or manifold to the LNG storage tanks; the insulated cryogenic pipe from the tank to the evaporator; the gas pipe from the evaporator to the gas valve unit, which may be insulated where it runs on open deck; the gas pipe from the gas valve unit to the engine; and the vent pipes.
Where the piping runs on open deck, single wall pipe is normally used. Where gas fuel piping passes through certain enclosed spaces, the IMO IGC/IGF requirements generally call for either a double-wall piping arrangement or installation within a ventilated pipe or duct. This means projects may combine single wall insulated LNG bunker pipe, double wall insulated pipe for LNG and cold gas, either pre-insulated or vacuum insulated, and un-insulated double wall pipe for ambient temperature gas running to and from the gas valve unit.
The pre-insulated straight pipes and components are insulated with a cryogenic polyurethane foam, specially formulated to meet service requirements down to −200°C and fulfilling the requirements of EN 253 at temperatures up to +140°C. The foaming propellant and cell gas is a mixture of CO₂ and cyclopentane, completely free of CFC and HCFC, with an ODP and GWP of zero. The foam is homogeneous with an average cell size of maximum 0.5 mm and contains no foreign matter that could lead to the formation of cold bridges.
The outer casing is extruded from black high-density polyethylene with high resistance to UV degradation, slow crack growth and rapid crack propagation, suited to service in both tropical and arctic conditions for periods exceeding 30 years. Casings are available in outer diameters up to 1400 mm.
The primary benefit compared with conventional cryogenic pipe insulation is that the system is a 100% waterproof bonded system. There is no carrier pipe movement within the insulation, which eliminates water ingress and mechanical wear. Because of the sandwich construction, the complexity and number of pipe supports can be significantly reduced, and supports are placed directly on the insulation jacket rather than penetrating it.
To qualify the pre-insulated pipe systems for LNG applications, an elaborate full scale test programme was carried out at cryogenic temperatures and documented by independent energy research institutes. Materials were cycled between ambient and cryogenic temperatures to verify the bond strength between the PUR foam and the carrier pipe, and a full scale loop of 4″ and 20″ pre-insulated pipe was cycled between −195°C and +55°C, supported by FEM analyses. No cracks appeared, and the system remained bonded throughout.
The service pipe is typically AISI 316L stainless steel, selected because stainless steel remains ductile at cryogenic temperatures. Other material types, including super duplex, can be fabricated on request. Wall thickness is selected according to the individual project requirements, but is typically not greater than schedule 10S per ASME B36.19-20. The service pipe is supplied with mill test certificate 3.1, with upgrade to 3.2 available.
Standard catalogue components cover DN15 to DN300 in single wall, insulated double wall, un-insulated double wall and vacuum insulated versions, including straight pipe, 3D 90° elbows, concentric and eccentric reductions and straight tees. Straight pipes are supplied in 6 metre lengths, elbows as 1 by 1 metre, and reductions in 2 meter lengths, with other lengths available on request.
LR Marine does not supply the pipe system as loose components. The system is divided into pre-fabricated spools based on the project routing, which minimizes the work at the shipyard and reduces the risk of locking the pipe inappropriately — the pipe must be allowed to move freely, and the elbows are what allow that movement.
Approximately 90% of the insulation work is completed in the LR Marine factory, reducing onsite work to a limited number of field joints. Those joints are sealed with crosslinked, heat-shrinkable tubular casing joints, installed with a propane torch so the adhesive bonds fully to the HDPE casing. The result is 100% watertight and vapour tight.
Once the routing of the pipe system is frozen, LR Marine conducts a stress analysis. For pipes with design temperatures below −110°C, stress analysis is typically required by the applicable class rules, which in practice covers most systems carrying liquid gas. The analysis is performed in Caesar II, and both the full report and a summary of the results are submitted.
The project documentation package typically includes stress analysis, drawings, pipe material certificates, weld map, NDT reports, pressure testing reports, welder certificates, WPS, WPQR and, where relevant, the vacuum application certificate.
Read more about double wall pipe systems and class requirements, or about our vacuum insulated pipe systems for installations where space is limited. Contact LR Marine to discuss the piping for your newbuild or conversion project.